Local
Century-old water pipe puts Trail infrastructure needs into perspective
A Roundtable is a way to meet new people and discuss this article in person at a local coffee shop or other venue.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: Rossland News

A piece of wooden pipe dating back to around 1926 offered Trail council a glimpse into the city’s infrastructure history, while a second, more modern pipe illustrated the costly consequences of aging underground utilities. Two sections of six-inch watermain were presented during council’s Monday, Nov. 23, committee of the whole meeting to demonstrate how Trail’s water distribution system has evolved over the past century and why ongoing investment in infrastructure replacement is essential. One sample, removed from Shavers’ Bench, was constructed from wooden staves held together with metal wire. According to Craig Speers, utilities manager for the City of Trail, the wooden pipe was part of a watermain installed approximately a century ago. The watermain served the neighbourhood for about 30 years before being replaced with asbestos cement pipe around 1956.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at Rossland News



