Local
Demolition work finally begins on condemned former nursing home in Belfast
A Roundtable is a way to meet new people and discuss this article in person at a local coffee shop or other venue.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: Bangor Daily News

After years of limbo, work has begun on dismantling a condemned former nursing home in downtown Belfast Lakeside Construction, the company that was contracted to complete the demolition, began the first phase of the project Oct. 26, said Thomas Kittredge, Belfast’s economic development director. That phase, which included removing the High Street building’s asbestos siding and copper wiring, has been completed. Building demolition is estimated to begin in mid-December, but a specific date has not been determined, Kittredge said. A proposed schedule released by Lakeside Construction on Oct. 20 said that building demolition would begin Nov. 9 and be completed by Dec. 11. The start of work comes years after the city pushed to have the neglected building repaired or removed. The nursing home, operating as Bradbury Manor, closed in the 1990s and hasn’t been used since, though owners at the time said they wanted to find a new use for the building.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at Bangor Daily News


