Local
Downey planners to consider Coca-Cola plant expansion
A Roundtable is a way to meet new people and discuss this article in person at a local coffee shop or other venue.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: The Downey Patriot
The Coca-Cola bottling plant on Cleta Street in Downey, where Reyes Coca-Cola Bottling is proposing a two-phase expansion. The Planning Commission will consider the proposal Wednesday. (Photo by Eric Pierce) DOWNEY — The Downey Planning Commission on Wednesday will consider a two-phase expansion of the Coca-Cola bottling plant on Cleta Street that would add a nearly 90,000-square-foot building and an on-site power system that captures carbon dioxide from generator exhaust for use in carbonating beverages.Reyes Coca-Cola Bottling proposes to build both phases within its existing 41-acre campus at 8729 Cleta St., where beverage bottling began in the late 1950s. The plant employs about 730 people on-site across three shifts, with another 170 remote employees associated with the Downey operation, according to a city staff report.The first phase would add an 89,889-square-foot building with manufacturing, warehouse and office space, rooftop solar panels and six trailer loading docks.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at The Downey Patriot


