Local
Firm to look at Potter Cove stormwater system
A Roundtable is a way to meet new people and discuss this article in person at a local coffee shop or other venue.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: Jamestown Press
The town council has awarded a $100,200 contract to GZA GeoEnvironmental Inc. to design a system that would mitigate stormwater damage at Potter Cove. The councilors unanimously awarded the contract at its meeting Monday. The planning department’s sustainability coordinator, Carissa Mills, recommended GZA, which oversaw the closure of the landfill. “They have a strong team and relevant experience with stormwater management design and permitting,” she said. The money comes from a $115,000 grant awarded by the Rhode Island Infrastructure Bank in June to improve the shoreline embankment at Potter Cove. The parking area on Freebody Drive, according to the infrastructure bank, is “downgradient of a steep hill overlooking the beach” along East Shore Road. It consists of gravel parking spaces with a culvert at the base of the hill that conveys water from a channel south of the roadway to a flat area adjacent to the beach north of the road.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at Jamestown Press



