Local
Fullerton Road Underpass Opens in Industry, California
Meet in Common connects news with real conversations. Use ThinkMatch to arrange a Roundtable and meet people to discuss this story.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: Hoodline

Officials in Industry gathered this week to mark the completion of the Fullerton Road Grade Separation Project, a six-lane underpass now tucked beneath a four-track Union Pacific railroad bridge that carries both freight and Metrolink trains. The new roadway replaces a railroad crossing that had been the site of collisions for years, and local leaders are framing its opening as a major win for safety and traffic flow in the San Gabriel Valley. The project lowers Fullerton Road under the existing tracks rather than forcing vehicles to cross them at grade, according to MyNewsLA.com, which reported on the ceremony marking the underpass's opening. The San Gabriel Valley Council of Governments has said the finished underpass is expected to serve more than 25,000 vehicles a day while handling industry and nearby Rowland Heights traffic that previously had to contend with train delays at the surface crossing.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at Hoodline



