Local
Lake Mitchell’s canal bridge decay persists as second grant application fails
A Roundtable is a way to meet new people and discuss this article in person at a local coffee shop or other venue.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: Daily Republic
MITCHELL — Another year, another bad report on the canal bridge at Lake Mitchell. Eric Prunty, professional engineer and Mitchell area manager at Brosz Engineering, gave a detailed report of four bridge and culvert inspections to the Mitchell City Council during its Monday meeting. Brosz Engineering conducts various bridge inspections annually for the city and for Davison County. The canal bridge shows stress, according to Prunty. The bridge has a single-span double T, with a “severe decay” of the north abutment cap; “overly stressed” timbers on piles three, four and five; stress on pile six; and the west exterior cap has “severe decay.” The structure is load rated at 50% of legal loads due to this north abutment cap, according to Prunty. The canal bridge was weight limit reduced in 2021. The bridge is inspected annually. Prunty stated if the city would like to get the bridge up to legal load bearing capacity, the north abutment cap or the entire bridge would need replacing.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at Daily Republic



