Local
Landlord of future A's Vegas stadium may need to cover additional construction costs
Meet in Common connects news with real conversations. Use ThinkMatch to arrange a Roundtable and meet people to discuss this story.
Source: The Nevada Independent

The landlord for the future $2.1 billion Major League Baseball stadium in Las Vegas may be willing to kick in as much as $250 million to cover a shortfall by Bally's Corp., which is building the non-gaming components for the future home of the Athletics. During a contentious hourlong hearing with the Las Vegas Stadium Authority last week, Gaming and Leisure Properties President Brandon Moore said the company had already set aside $125 million — funds left over from the October 2024 demolition of the Tropicana Hotel & Casino — for Bally's planned $1.9 billion entertainment district that will surround the ballpark, located on a 35-acre parcel located on the Strip. Stadium Authority Chairman Steve Hill called for the meeting ahead of a planned Dec. 3 meeting to address development of the northwest plaza entrance that will serve as the main access point from the Strip for ticketed fans when the stadium opens in April 2028.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at The Nevada Independent



