Local
Merrimack And Bedford Drivers Face Overnight Detour On Everett Turnpike Nov. 14
Meet in Common connects news with real conversations. Use ThinkMatch to arrange a Roundtable and meet people to discuss this story.
Source: Patch

Lane closures, rolling roadblocks, and a detour are planned between Exits 10 and 13, weather permitting, on Saturday night, Sunday morning. CONCORD, NH — Drivers in Merrimack and Bedford should expect overnight delays and a detour on the Everett Turnpike this weekend as the New Hampshire Department of Transportation carries out roadwork tied to a long-term construction project. The work is scheduled between Exits 10 and 13 from 8 p.m. on Saturday, Nov. 14, to 5 a.m. Sunday, Nov. 15, weather permitting. According to the New Hampshire Department of Transportation, the traffic plan includes lane closures, rolling roadblocks and a detour on both the northbound and southbound sides of the highway. Southbound lane closures are scheduled to begin at 8 p.m. At about 10 p.m., northbound traffic is set to be diverted to allow for the launching of a temporary bridge over the Everett Turnpike at Baboosic Lake Road. Find out what's happening in Merrimackfor free with the latest updates from Patch.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at Patch



