Local
More major repairs almost finished on Potomac Interceptor sewage line – WTOP News
Meet in Common connects news with real conversations. Use ThinkMatch to arrange a Roundtable and meet people to discuss this story.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: WTOP News

Potomac Interceptor repairs reach another milestone Repair work to shore up the Potomac Interceptor sewage line that ruptured earlier this year, spewing hundreds of millions of gallons of wastewater into the Potomac River, is hitting another milestone. After the big break, four areas of the pipe were identified for emergency repairs, including a section off River Road north of Potomac, Maryland, near the Pennyfield Lock. Moussa Wone, D.C. Water’s chief engineer for the project, said the process of sliplining the segment is all but complete. “We put in a new pipe inside the old pipe and that new pipe basically buys us time, I would say 50 to 75 years,” Wone said. Earlier this year, D.C. Water announced emergency repairs at four locations along the Potomac Interceptor, Dulles Airport and Broad Run in Loudoun County, Virginia, Pennyfield Lock and the D.C.-Maryland border along Clara Barton Parkway. The two Loudoun County repairs were completed earlier this summer.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at WTOP News



