Local
New NDHP e-permit system to help drivers navigate routes
Meet in Common connects news with real conversations. Use ThinkMatch to arrange a Roundtable and meet people to discuss this story.
Source: Grand Forks Herald

GRAND FORKS — In August, three houses got stuck on Interstate 29 southbound near DeMers Avenue. Now, an updated e-permit system could prevent it from happening again. In North Dakota, vehicles carrying oversize or overweight loads are required to obtain permits that outline the route they will follow. With the current permit system, which will update on Nov. 17, drivers manually track their routes. Jackie Darr, the permit office supervisor with the North Dakota Highway Patrol, said the new system will help with navigation. “The driver doesn’t have to be watching his permit as much because the system’s watching it for him,” she said. In August, three trucks carrying manufactured homes went off their route and got stuck on I-29 southbound. The drivers reached the overpass at DeMers Avenue when they realized construction had made it too narrow to cross. The houses were stuck on the side of the interstate, out of the flow of traffic, for three days.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at Grand Forks Herald



