Local
Plans display for Templeton bridge project announced
Meet in Common connects news with real conversations. Use ThinkMatch to arrange a Roundtable and meet people to discuss this story.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: The Courier Express

Facebook Twitter WhatsApp SMS Email Facebook Twitter WhatsApp SMS Email Print Copy article link Save Facebook Twitter WhatsApp SMS Email Print Copy article link Save TEMPLETON – The Pennsylvania Department of Transportation (PennDOT) invites the public to view plans regarding the Templeton Group Bridges replacement project in Pine Township, Armstrong County. The purpose of the virtual plans display is to share preliminary information on the project’s status, schedule, design and right-of-way acquisition. The Templeton Group Bridges project consists of the replacement of the existing structures that carry Route 1030 over Wiskey Creek in Pine Township, Armstrong County. The existing structures will be replaced with precast concrete box culverts. Guide rail and pavement markings will also be updated. Construction for the project is anticipated to begin in spring 2029. An online presentation of the project will be available which outlines and explains the proposed plans and schedule.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at The Courier Express


