Local
Port to begin repairs on Bayshore Bikeway weeks after warning the area was at risk of flooding from El Niño
A Roundtable is a way to meet new people and discuss this article in person at a local coffee shop or other venue.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: La Jolla Village News

The Port of San Diego will soon make emergency repairs to a bikeway in the South Bay that officials say was damaged by surging water levels in the bay. In a press release Wednesday, officials blamed El Niño conditions and recent Kelvin waves for eroding an embankment and destabilizing a section of the Bayshore Bikeway path. Kelvin waves occur during an El Niño. They are slow-moving, warm-water waves stretching across miles on the Pacific that get trapped on the West Coast and raise water levels by up to a foot. The Bayshore Bikeway crosses a tidal channel in Imperial Beach, where at Pond 10A, high water levels damaged culverts and an embankment. The damage is isolated to a section between Flamingo Trail and state Route 75, officials said. The emergency repairs should last 15 to 20 days, depending on the tides. The path could fully reopen in mid-December.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at La Jolla Village News



