Local
Ribbon-cutting ceremony held for newly reconstructed South Rochdale Playground in Jamaica
A Roundtable is a way to meet new people and discuss this article in person at a local coffee shop or other venue.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: QNS

A ribbon-cutting ceremony was held on Monday, Nov. 23, to mark the reopening of the South Rochdale Playground, located at 173rd Street and 134th Street in Jamaica, following its reconstruction. The $5.85 million redesign and rebuilding of the playground included installing new play equipment, swings, water play features, a full-size basketball court, a running track and adult fitness equipment. New seating areas, water fountains and lighting were also added to the South Rochdale Playground. Additionally, the water supply systems were reconstructed. [caption id="attachment_630988" align="alignnone" width="2400"] Photo credit: NYC Parks/Daniel Avila[/caption] Built to tournament size, the basketball court has bleacher seating, as well as an additional half-court. The court's perimeter is lined with new trees and benches. [caption id="attachment_630990" align="alignnone" width="2400"] The basketball court at the South Rochdale Playground.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at QNS


