Local
Sea Bright Councilman Digs Deep into Bulkhead Project
A Roundtable is a way to meet new people and discuss this article in person at a local coffee shop or other venue.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: Two River Times

Around Town: Sea Bright News By Emily Schopfer SEA BRIGHT – Sea Bright faced many hurdles in recent months: beach erosion, a contested municipal election and frequent riverside flooding. With $37 million in beach replenishment secured and the election wrapping up, the borough can turn its attention to the Shrewsbury River.The river has caused significant flooding in recent months, most recently during the late-September nor’easter, which brought over five feet of water to some parts of the borough’s downtown section.To address repeated flooding, the borough council proposed the Flood Mitigation Project this summer. It would include new check valves, pump stations and roughly 1,350 feet of improved riverfront bulkhead between North Beach, Downtown and South Beach. Much, if not all, of the project area already has a riverfront bulkhead, but existing bulkhead is below the 7-foot height requirement.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at Two River Times


