Local
SK Hynix's (SKHY) new chip plant will house a $654 million supplier test line, with 49% funded by government
Meet in Common connects news with real conversations. Use ThinkMatch to arrange a Roundtable and meet people to discuss this story.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: AIStockWire

Key points SK Hynix shows reporters its planned supplier test line Korean governments cover 49% of Trinity Fab's cost SK Hynix helps suppliers cover R&D costs when projects fail SK Hynix is building a test line inside its first Yongin plant where smaller Korean chip suppliers can try out their materials, parts, and equipment under production-like conditions. Reporters toured the planned Trinity Fab (트리니티 팹) on November 10, and their stories appeared on November 16, Korea time. The line gives suppliers a way to test products on chipmaking tools before trying to sell them. It will occupy about 3,305 square meters on the third floor of the Yongin fab, south of Seoul, with about 50 tools for lithography, etching, deposition, cleaning, and measurement. The cleanroom is scheduled to open in May 2027. Testing for outside companies is expected to begin in the fourth quarter of 2027. Public money covers almost half of Trinity Fab Trinity Fab has a budget of 874.6 billion won ($654M).
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at AIStockWire


