Local
The History of the Brackenridge Field Laboratory
A Roundtable is a way to meet new people and discuss this article in person at a local coffee shop or other venue.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: The Austin Chronicle

UT professor Lawrence Gilbert has worked at the Brackenridge Field Laboratory since he was a student in the 1960s. He became its director in 1980. Wearing an Indiana Jones fedora and sounding every bit the fifth-generation Texan that he is, the 84-year-old Gilbert sat before an inflatable movie screen at one of the BFL’s Science Under the Stars events on Nov. 12 and told the history of the field lab. Gilbert began the story in the 1880s, as a group of investors began quarrying limestone on the BFL site to build a hydroelectric dam across the Colorado River. The dam was completed in 1893 on the same spot as today’s Tom Miller Dam, just upriver of the field station. But it failed in 1900, sending an 80-foot-tall wave of muddy water crashing over the future field station, burying much of it in silt. The site sat undeveloped until the 1960s, when UT began carving out BFL’s offices and labs. However, those structures account for just a small bit of the site’s 82 acres, Gilbert said.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at The Austin Chronicle



