Local
Town of Rockland Studies Flood Mitigation Options
Meet in Common connects news with real conversations. Use ThinkMatch to arrange a Roundtable and meet people to discuss this story.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: Radio Catskill

The Town of Rockland is studying ways to reduce flooding in Livingston Manor following a July storm that sent waterways over their banks, flooded roads and businesses, and forced the evacuation of five residents. Town Supervisor Rob Eggleton says the work is part of the state’s Resilient NY program, funded through the state Department of Environmental Conservation. The state hired consulting firm SLR to analyze historical flooding in the town, dating back to the late 1800s. “We’re never going to stop the flooding, but we want to be able to reduce the flooding as much as possible,” Eggleton said. One priority is lowering flood levels along Main Street in Livingston Manor, where the Willowemoc Creek and Little Beaverkill converge. Eggleton says consultants are examining whether widening streambanks and slowing water flow could help reduce flooding. The town has also been working with the U.S. Army Corps of Engineers for about a decade.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at Radio Catskill
