Local
‘We’re almost there’ - Tama County Sheriff asks for patience as frustrations grow over Highway 63 closure
A Roundtable is a way to meet new people and discuss this article in person at a local coffee shop or other venue.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Source: KCRG

TAMA CO., Iowa (KCRG) - Highway 63 in Tama County is set to reopen Wednesday, Nov. 25, later than planned. The Iowa Department of Transportation blames a wet year for the delay. The closure covers nearly 12 miles, from Toledo north to Highway 96. It has lasted more than six months and left drivers frustrated. Crews started rebuilding a stretch of Highway 63 in Toledo in April. Frank Leong, a construction engineer for the Iowa DOT, said the DOT opted for a total reconstruction over resurfacing because the highway was so deteriorated. “We basically had to obliterate the road that was there before because it has exceeded its lifetime,” Leong said. Leong said the new road should last about 20 years once it opens. However, the project was supposed to be done in October. “We had an abnormally wet year,” Leong said.
This excerpt comes from the named source. Read the original for the full reporting.
Read the original at KCRG



