BP Silver Corp - New High-Grade Silver Discovery at Jalsuri Northeast, Intersecting 2,620 g/t Silver over 1 Meter, Within a 12-Meter Interval Grading 441 g/t Silver

Listen through the publisher, then discuss the episode here or arrange an in-person Roundtable. Your city determines where to meet.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Tim Shearcroft, CEO and Co-Founder of BP Silver Corp. (TSX.V: BPAG) (OTCQB: BPSCF), joins me to review the high-grade silver results from the first two diamond drill holes completed at the Jalsuri Northeast target as part of its Phase 2 drill program at the Cosuño Silver Project, in Bolivia. These are the best intercepts drilled to date at the Project, and further evidence of a robust mineralized system. HIGHLIGHTS: High-grade silver mineralization: Both drill holes returned broad zones of near-surface high-grade silver mineralization within which high-grade silver grades occur: Drill hole CO-0023 intersected 12 meters ("m") grading 441 grams per metric ton ("g/t") silver and 0.26 g/t gold from 22-34 m within which 1 m returned 2,620 g/t silver (84.2 ounces per metric ton ("oz/t") from 31-32 m and 1 m grading 1,220 g/t (39.2 oz/t) silver from 33-34 m (Table 1). These high-grade intervals occur within a broad 32-m intersection grading 185 g/t silver and 3.3% zinc. Drill-hole CO-0022 returned 7 m at 194 g/t silver including 1 m at 511 g/t silver from 28-29 m. These drill holes are the first tests of the Jalsuri Northeast target which outcrops over 1 kilometer strike and demonstrate continuity of high-grade silver mineralization between the holes with grades increasing with depth. Importantly, the mineralization remains open at depth as well as on strike, highlighting the potential for further expansion of this emerging silver zone. Tim goes on to unpack how these results factor into the larger exploration initiatives from the sampling, mapping, geological surveys, and other Phase 1 and Phase 2 results thus far. We discuss what the follow-up process will be at Jalsuri North and Jalsuri Northeast, where other holes have been drilled that are still awaiting assays. Next, we reviewed the follow up drilling that has been testing the recent high-grade results at Pocañita Chica from CO-0013, and undercutting the prior holes drilled CO-008 and CO-009 during Phase 1 drilling, to test the potential deeper feeder zones. Wrapping up we also discussed the imminent initiatives to do first pass drilling at the new Chanca target, as well as the larger Pocañita Grande target as part of this Phase 2 drilling. There will also be incoming IP survey data that gets paired with all this prior drilling data, to then set up the targeting for Phase 3 drilling early in the new year. Click here to follow the latest news from BP Silver Corp (https://www.bpsilvercorp.com/news.html) For more market commentary & interview summaries, subscribe to our Substack reports: The KE Report: https://kereport.substack.com/ Investment disclaimer: This content is for informational and educational purposes only and does not constitute investment advice, an offer, or a solicitation to buy or sell any security. Investing in equities and commodities involves risk, including the possible loss of principal. Guests and hosts may own shares in companies mentioned.
Episode information is provided by the publisher. Listening takes place on the publisher’s service.
Listen at the source ↗








