Dakota Gold – Richmond Hill Drill Assays and Metallurgical Results, Trade-Off Studies For Upcoming 2026 PFS and 2027 FS, Maitland As Future Growth Project

Listen through the publisher, then discuss the episode here or arrange an in-person Roundtable. Your city determines where to meet.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
[Recorded 10-30-2026 at NOIC] Robert Quartermain, Co-Chairman and Director of Dakota Gold (NYSE American: DC), joins us live at the New Orleans Investment Conference to unpack the recent news on drill assays and metallurgical results, which will feed into the trade-off studies and upcoming economic studies for their Richmond Hill Oxide Heap Leach Gold Project; located in the historic Homestake District of South Dakota. We also discuss how the Maitland Gold Project provides the next project in their development pipeline; painting the big-picture growth vision of the Company. We start off with a broad update reviewing recent drill results from the 2026 exploration program, and the metallurgical test results, which will be incorporated into the updated Resource Estimate and Pre-Feasibility Study (PFS) targeted for Q4. We also have Bob outline some of the key design decisions and trade-off studies factoring into the Feasibility Study economics slated for mid-2027. Dakota Gold has completed the PFS trade-off evaluation of the primary crushing options and selected a 0.5-inch (12.7-millimeter) design crush size. Recent metallurgical testing indicated modeled ultimate gold recovery for oxide material averaged 80.4% at a 0.5-inch crush size, compared with 75.9% at a 1-inch crush size. The updated resource informing the PFS will incorporate 333 drill holes completed in 2025 and 2026, representing 30% more drilling data from the prior resource, and will be entirely focused on oxide material. The PFS will exclude transition material, which represented roughly 18% of the heap leach material in the prior resource. The Company has also selected a single heap-leach facility located generally within the area identified for Phase 1 in the IACF, rather than the multiple conceptual heap-leach areas previously considered. The consolidated configuration will simplify material handling and solution management, optimize operations, and consolidate the geotechnical design and monitoring program within one operational area. Wrapping up, Bob highlights how the Maitland Gold Project, will give the Company a solid second development project to with mineralization similar to the Homestake Mine, which is along trend, and provides the potential for future growth in their operations and production within this prolific mining jurisdiction. If you have any questions for the team at Dakota Gold, then please email those to me at [email protected]. In full disclosure, Shad is a shareholder of Dakota Gold at the time of this recording, and may choose to buy or sell shares at any time. Click here to follow the latest news from Dakota Gold (https://dakotagoldcorp.com/investor-info/news/2026) For more market commentary & interview summaries, subscribe to our Substack reports: The KE Report: https://kereport.substack.com/ Investment disclaimer: This content is for informational and educational purposes only and does not constitute investment advice, an offer, or a solicitation to buy or sell any security. Investing in equities and commodities involves risk, including the possible loss of principal. Guests and hosts may own shares in companies mentioned.
Episode information is provided by the publisher. Listening takes place on the publisher’s service.
Listen at the source ↗









