Koryx Copper in Final Stages of its Haib PFS

Listen through the publisher, then discuss the episode here or arrange an in-person Roundtable. Your city determines where to meet.
Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.
Koryx Copper CEO Heye Daun joins Trevor Hall at the Precious Metals Summit in Zurich to discuss the upcoming pre-feasibility study for the Haib Copper Project in Namibia. Daun outlines the significant improvements achieved over the past year, including resource expansion, conversion of inferred resources to indicated, reduced stripping ratios, and processing optimizations designed to increase throughput and copper-equivalent feed grades. The conversation explores the potential for annual copper production exceeding 100,000 tonnes, anticipated competitive operating costs, and the decision to simplify the project's flowsheet by removing oxide heap leaching.
Episode information is provided by the publisher. Listening takes place on the publisher’s service.
Listen at the source ↗






