#380 Project Overruns: From the Indus to the Data Centre

34 min

Listen through the publisher, then discuss the episode here or arrange an in-person Roundtable. Your city determines where to meet.

Roundtables are designed for groups of four, with a shared subject and room for everyone to speak. Come for discussion, with no dating expectation.

Major infrastructure projects consistently cost more and take longer than planned. After more than a century of building megaprojects, some sectors show little or no evidence at getting better at estimating them. In this episode, we speak with an expert in project cost and schedule overruns. From an early fascination with Pakistan’s great dams and work financing infrastructure at the World Bank, then on to research at the University of Oxford covering sustainable megaprojects, this is a career examining the gap between what projects promise and what they deliver. We explore the psychology behind overruns, including optimism and uniqueness bias, and the use of reference class forecasting to try to tame these. Even apparently bespoke megaprojects belong to useful reference classes, and many of the most significant projects of today are particularly amenable to this approach. Guest Atif Ansar, Co-founder, Foresight

Episode information is provided by the publisher. Listening takes place on the publisher’s service.

Listen at the source ↗

Featured places to meet in Palo Alto, CA

Explore these places and arrange a conversation through ThinkMatch.

City guide for Palo Alto, CA

More from Engineering Matters

Engineering Matters

#379 The Cost of Time: Modern British Manufacturing

32 min

Manufacturing accounts for 8% of UK GDP directly. Counting its supply chains and the spending of the people it employs, that figure rises to 23%, according to a 2024 Oxford Economics study for the Manufacturing Technologies Association (MTA). Yet the sector pays some of the highest energy costs in Europe and relies heavily on imported materials. It also struggles to recruit, held back by an image that no longer matches the modern factory floor. At the same time, many workshops are sitting partly idle. Xometry’s 2027 Manufacturing Outlook report found that 37% of smaller manufacturers are carrying spare capacity, against 11% of larger ones. Meanwhile buyers still contend with slow quotation processes and fragile single-source supply chains. Engineering teams are shrinking, and the time lost to sourcing carries a cost that unit price alone does not show. In this episode, MTA president Stewart Lane describes the pressures on British manufacturing, including the wait for clarity on defence

Discuss this episode

Community Poll

Public institutions should accommodate religious practices when doing so does not unfairly burden others.

Share your view, then see how readers voted. No sign-in required. This poll is shared across stories.

Do you agree or disagree?

Choose one answer

Common Quandary

A Common Quandary to discuss

Another conversation to explore, separate from this news story.

An AI wrote the perfect condolence message for you. Is it still from the heart?

Your friend is grieving. You want to reach out, but words fail you, so you ask an AI to draft a condolence message. It expresses exactly what you feel. You revise it and send it without mentioning the help.

Does assistance make the expression less sincere?

Explore this quandary